MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Marcos inspects rock shed project in Benguet
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://mpkylg.jyxingfa.com
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.

- Lone bettor wins P86M in 6/42 lotto draw for Sept 6
- Marcos, first lady visit Cambodia to boost ties
- PH Construction Board asked to address 'accreditation for sale' scandal
- House starts flood control probe
- LPA affects Metro Manila, Mindanao, Visayas
- House party leaders want to return proposed 2026 budget to Executive
- Guyana votes amid oil boom, Venezuela tensions
- Labubu fans flock to stores after launch of mini dolls
- Israeli forces seize nearly 0,000 in West Bank raid
- Thai PM Paetongtarn Shinawatra sacked; new turmoil feared